Operation of substructure of third part of Semnan railway - Damghan

Operation of substructure of third part of Semnan railway - Damghan

 

Operation of substructure of two-way railway with third part of Semnan railway - Damghan
From km 304 to 333


Employer: Deputy Director of Railways Construction and Development

Consultant: Matar Consulting Engineers

Excavation volume:
700 700 cubic meters
Embankment volume:
000 550 1 cubic meter
Hardware:
950kg
Number of bridges:
97 devices