construction of Lot3 Mianeh - Bostanabad - Tabriz railway project

 construction of Lot3 Mianeh - Bostanabad - Tabriz railway project

  Construction of large bridges located in Lot3 Mianeh - Bostanabad - Tabriz Railway Project


Employer: Ministry of Roads and Transportation
Consultant: Hexa Consulting Engineers


Heavy steel work: 6,400 tons
height of bridge: 55 m
tow unit galleries:1338 and 425 meters length,11 meters width by 8 m hight
Concrete pouring: 52,000 m3
Form works: 69.000 m2
Rebar: 5,400 tons
soil works: 1.400.000 m3