Valley of Arpachai Valley located at the middle of the Ardebil railway

Operation of bridge 550 + 336 km (Arpachai) on the middle axis of Ardebil railway
Employer: Construction and Development Company of Transportation Infrastructure of the country
Consultant: Patilo Consulting Engineers
A bridge device consists of two 35-meter spans and three 65-meter spans, the height of the tallest base below the slab of over 75 meters
Heavy steel operation: 196,450 tons
Excavation and excavation: 10,000 cubic meters
Concreting: 9.965 cubic meters
Formatting: 13.310 square meters
Armature: 1.100 tons